Global
Careers
News
Sign In / Register
£ GBP
£ GBP
€ EUR
Basket
Search the BSRIA Ltd. website
Test & Research
Test & Research
Test
Product testing
Mock-up testing
On-site, witness and factory acceptance testing
Type-test certificate and report directory
Research
Built2spec
CILECCTA
Cold cabinets
Domestic hot water
DURABROADS
I3CON
iCAT
Isolation rooms
Pumping systems
Wind turbines
Consultancy
Consultancy
Project process improvement
BG 6 Design Framework for Building Services
BIM support
Information and classification
Life cycle costing
Soft Landings
Building and services improvement
Building performance evaluation
Condition monitoring
Energy advice
Indoor air quality
Maintenance Strategy
Mock-up testing
Ventilation Verification Service
Building and services investigation
Failure investigations
Indoor environment investigations
Overheating in buildings
Thermal Imaging Surveys: An introduction
Wellbeing
Covid-19 Guidance and Support Services
Instruments
Instruments
Instrument sales & hire
Air quality
Airflow
Airtightness, ductwork and smoke generators
Combustion & gas
Electrical
Fluid / water flow
Fluid / water quality
Frequency
Light
Multifunctional data loggers and kits
Pressure
Sound
Special offers
Survey equipment
Temperature
Temperature humidity and dew point
Accessories
Adaptors
Batteries & Chargers
Cases
Fluids & Aerosols
IR Parts
Kits
Leads & Cables
Miscellaneous
Printers & Paper
Probes incl CT's and Tranducers
Replacement Parts
SD Card & Memory
Software
Tubes & Fittings
Manufacturers
Browse by manufacturers
Calibration
Air velocity
Calibration enquiry
Combustion and gas
Electrical
Frequency
Humidity / frost and dew points
Illuminance (light)
Pressure (gas)
Sound (noise)
Temperature
Volume flow (air)
Volume flow (water)
Compliance & Site Services
Compliance & Site Services
Airtightness
Consultancy and design reviews
Guidance to download
Testing dwellings
Testing non-dwellings
Sound insulation testing
Thermal imaging of building fabric
Ventilation testing
Knowledge
Knowledge
Bookshop
A-Z book list
About BSRIA publications
Amendments and corrections to guides
Briefing and procurement guides
BSRIA Blue Book
Commissioning guides
Design and management guides
Fire guides
Heating guides
Licensed versions of BSRIA Guides
Maintenance and FM guides
Mechanical & Electrical guides
Offers and discounts
Recent publications
Soft Landings Guides
Topic Guides
Water guides
White papers
Withdrawn and superseded publications
Information Centre
Careers in Engineering
Training
Market Intelligence
Market Intelligence
About WMI
Strengths
WMI Staff
Market consultancy
Areas of expertise
Research solutions
Market Reports
Air Conditioning
Building Controls
Energy Services
Heating
Refrigeration
Renewables
Smart Homes
Structured Cabling
Ventilation
Upcoming reports
Membership
Home
Knowledge
Bookshop
Withdrawn and superseded publications
Withdrawn and superseded publications
Statutory Compliance Inspection Checklist (Superseded) (BG 80/2022)
by David Bleicher & Nick Blake (March 2022)
This guide has been superseded by BG 80/2023. BSRIA’s Statutory Compliance Inspection Checklist is a spreadsheet listing all the tests, checks and inspections that are required on building services systems required by legislation, Approved Codes of Practice and/or supporting guidance. In addition to the spreadsheet, the guide includes general information about legislation in the UK and guidance on how to use the spreadsheet. This guide is aimed at facilities managers.
Digital download
£199.00
Pre-Commission Cleaning of Pipework Systems 6th edition (Superseded) (BG 29/2020)
by Martin Ronceray & Parsloe C (May 2020)
This guide has been superseded by BG 29/2021 Pre-Commission Cleaning of Pipework Systems amended 6th edition. Pre-commission cleaning is the process of bringing a closed heating or cooling system to a satisfactory state for commissioning and ongoing maintenance of water quality.
Digital download
£299.00
Floor Plenum Airtightness – Guidance and Testing Methodology (superseded) (BG 65/2016
by Tom Jones (July 2016)
This guide has been superseded by BTS 4/2024 Airtightness Testing of Raised Access Plenum Floors
Digital download
£99.00
Commissioning Air Systems (Superseded) (BG 49/2015)
by Chris Parsloe (March 2015)
This guide has been superseded by BG 49/2024 Commissioning Air Systems. The guide explains how to commission ducted air distribution systems in building, mainly the setting to work of the system fans and regulation of system flow rates.
Digital download
£299.00
Domestic Ventilation Systems - a guide to measuring airflow rates (Superseded) (BG 46/2015)
by Alan Gilbert & Chris Knights (January 2015)
This guide has been superseded by BG 46/2022 Domestic Ventilation Systems - A guide to measuring airflow rates. With improvements in dwelling airtightness and increased use of Mechanical Ventilation and Heat Recovery Systems (MVHR), getting ventilation right in buildings has become critical. This BSRIA guide will address these issues.
Digital download
£99.00
Design Framework for Building Services 4th Edition (Superseded) (BG 6/2014)
by David Churcher & John Sands (February 2014)
This edition was published in February 2014 and was superseded by the 5th edition (BG 6/2018) in June 2018
Digital download
£299.00
Domestic Ventilation Systems - a guide to measuring airflow rates (Superseded) (BG 46/2013)
by Hawkins G (May 2013)
This guide has been superseded by BG 46/2015 Domestic Ventilation Systems - A guide to measuring airflow rates. With improvements in dwelling airtightness and increased use of Mechanical Ventilation and Heat Recovery Systems (MVHR), getting ventilation right in buildings has become critical. This BSRIA guide will address these issues.
Digital download
£99.00
Pre-Commission Cleaning of Pipework Systems 5th edition (Superseded) (BG 29/2012)
by Brown R & Parsloe C (October 2012)
This Guide has been superseded by BG 29/2020 and BG29/2021
Digital download
£299.00
Design Framework for Building Services 3rd edition (Superseded) (BG 6/2012)
by David Churcher (August 2012)
Design Framework for Building Services 3rd edition (BG 6/2012)
Digital download
£299.00
Test Method for Pressure Independent Control Valves (Superseded) (BTS 1/2012)
by Judd C & Stonard P (May 2012)
BTS 1/2012 has been superseded by BTS 1/2019.
Digital download
£0.00
Pre-Commission Cleaning of Pipework Systems 4th edition (Superseded) (BG 29/2011)
by Brown R & Parsloe C (September 2011)
This has been superseded by BG29/2012
Digital download
£299.00
Design Framework for Building Services 2nd edition (Superseded) (BG 6/2009)
by David Churcher (February 2009)
Supersedes BSRIA TN 21/97, TN 22/97 and BG 6/2006. Provides a framework for allocating many of the design activities needed to complete a construction project. Superseded by BG 6/2012.
Digital download
£299.00
Handover, O&M Manuals, and Project Feedback (Superseded) (BG 1/2007)
by Bunn, Hastings & Pennycook K (October 2007)
This publication has been superseded by BG 79/2020 Handover information and O&M manuals
Digital download
£299.00
Business-focused maintenance (Superseded) (BG 3/2004)
by Harris J & Hastings P. (December 2004)
BG 3/2004 Business Focused Maintenance has been withdrawn from sale. in 2016.
Digital download
£299.00
Pre-Commission Cleaning of Pipework Systems 3rd edition (Superseded) (AG 1/2001.1)
by Parsloe C J (September 2004)
This publication has been superseded by BG 29/2011.
Digital download
£299.00
Guide to HVAC building services calculations (Superseded) (BG 30/2003)
by Lawrence Race G & Mitchell S (June 2003)
Superseded by BG30/2007 Guide to HVAC Building Services Calculations 2nd Edition.
Digital download
£299.00
BMS Maintenance Guide - Plus a model maintenance specification (Withdrawn) (BG 4/2003)
by Martin A. (May 2003)
This is a withdrawn publication. This guide details the issues involved in BMS maintenance and provides specification clauses to assist the procurement of a BMS maintenance service. It is aimed at facilities managers and others responsible for procuring BMS maintenance support services.
Digital download
£99.00
Commissioning water systems: Application principles (Superseded) (AG 2/89.3)
by Chris Parsloe (April 2002)
This Guide has been superseded by BG 2/2010 Commissioning Water Systems.
digital download
£299.00
Commissioning Air Systems. Application procedures for buildings (Superseded) (AG 3/89.3)
by Parsloe C. (November 2001)
This is a superseded publication. Please refer to the revision history (below) for current guidance
Digital download
£299.00
Pre-Commission Cleaning of Pipework Systems 2nd edition (Superseded) (AG 1/2001)
by Parsloe C J (February 2001)
This publication has been superseded by AG 1/2001.1
Digital download
£299.00
Guide to legionellosis - Operation and maintenance (Superseded) (AG 19/2000)
by Brown R G. & Roper M A. (October 2000)
This publication has been superseded by BG 58/2015 Legionnaire's Disease - Operation and Maintenance Log Book.
Digital download
£99.00
Allocation of design responsibilities - example drawings (Superseded) (TN 22/97)
by Parlsoe C. (January 1997)
Presents a supplement to BSRIA Technical Note TN21/97 'The Allocation of Design Responsibilities for Building Engineering Services - A Code of Conduct to Avoid Conflict'. Please note you are welcome to purchase / download a copy but this is a withdrawn publication.
Digital download
£299.00
Guide to legionellosis - temperature measurements for hot and cold water services (superseded) (AG 4/94)
by Pavey N (September 1994)
This is a superseded publication. Current BSRIA guidance on legionella can be found in BG 57/2015 Legionnaires' Disease - Risk Assessment and BG 58/2015 Legionnaires' Disease - Operation and Maintenance Log Book.
Digital download
£99.00
Design Framework for Building Services Original Publication (Superseded) (TN 8/94)
by Chris Parsloe (June 1994)
The original aim of this publication was to clarify the allocation of responsibilities and duties between building services designers, building services installers and the various specialist companies involved in a given building design.
Digital download
£299.00
1
2
»