Global
Careers
News
Sign In / Register
£ GBP
£ GBP
€ EUR
Basket
Search the BSRIA Ltd. website
Test & Research
Test & Research
Test
Product testing
Mock-up testing
On-site, witness and factory acceptance testing
Type-test certificate and report directory
Research
Built2spec
CILECCTA
Cold cabinets
Domestic hot water
DURABROADS
I3CON
iCAT
Isolation rooms
Pumping systems
Wind turbines
Consultancy
Consultancy
Project process improvement
BG 6 Design Framework for Building Services
BIM support
Information and classification
Life cycle costing
Soft Landings
Building and services improvement
Building performance evaluation
Condition monitoring
Energy advice
Indoor air quality
Maintenance Strategy
Mock-up testing
Ventilation Verification Service
Building and services investigation
Failure investigations
Indoor environment investigations
Overheating in buildings
Thermal Imaging Surveys: An introduction
Wellbeing
Covid-19 Guidance and Support Services
Instruments
Instruments
Instrument sales & hire
Air quality
Airflow
Airtightness, ductwork and smoke generators
Combustion & gas
Electrical
Fluid / water flow
Fluid / water quality
Frequency
Light
Multifunctional data loggers and kits
Pressure
Sound
Special offers
Survey equipment
Temperature
Temperature humidity and dew point
Accessories
Adaptors
Batteries & Chargers
Cases
Fluids & Aerosols
IR Parts
Kits
Leads & Cables
Miscellaneous
Printers & Paper
Probes incl CT's and Tranducers
Replacement Parts
SD Card & Memory
Software
Tubes & Fittings
Manufacturers
Browse by manufacturers
Calibration
Air velocity
Calibration enquiry
Combustion and gas
Electrical
Frequency
Humidity / frost and dew points
Illuminance (light)
Pressure (gas)
Sound (noise)
Temperature
Volume flow (air)
Volume flow (water)
Compliance & Site Services
Compliance & Site Services
Airtightness
Consultancy and design reviews
Floor plenums
Guidance to download
Testing dwellings
Testing non-dwellings
Sound insulation testing
Thermal imaging of building fabric
Ventilation testing
Knowledge
Knowledge
Bookshop
A-Z book list
About BSRIA publications
Amendments and corrections to guides
Book sets
Briefing and procurement guides
BSRIA Blue Book
BSRIA Business Bulletin
Commissioning guides
Delta T
Design and management guides
Fire guides
Heating guides
Licensed versions of BSRIA Guides
Maintenance and FM guides
Mechanical & Electrical guides
Offers and discounts
Recent publications
Soft Landings Guides
Topic Guides
Water guides
White papers
Withdrawn and superseded publications
Information Centre
Brexit information
Careers in Engineering
Legislation
Library
Online resources
Training
Market Intelligence
Market Intelligence
About WMI
Strengths
WMI Staff
Market consultancy
Areas of expertise
Research solutions
Market Reports
Air Conditioning
Building Controls
Energy Services
Heating
Refrigeration
Renewables
Smart Homes
Structured Cabling
Ventilation
Upcoming reports
New reports
Membership
Home
Knowledge
Bookshop
Commissioning guides
Commissioning guides
Contact Information Centre
Close
+44 (0) 1344 465571
+44 (0) 1344 465571
information@bsria.co.uk
Close
Commissioning Air Systems (BG 49/2024)
by Keith Barker (June 2024)
This guide supersedes BG 49/2015. It explains how to functionally test and regulate ventilation systems in buildings. It has been updated to reflect new technologies and recently published industry guidance.
Digital download
£80.00
Life Safety and Firefighting Power Supplies (BG 70/2021)
by Tony Mayo (September 2021)
This guide provides information on designing power supplies to systems such as sprinkler pumps, smoke control systems and firefighting lifts. It draws together the requirements outlined in many product and application specific standards. This second edition takes into account changes to standards that have been made since the first edition (BG 70/2017 ) was published in 2017.
Digital download
£90.00
Pre-Commission Cleaning of Pipework Systems Amended 6th edition (BG29/2021)
by Martin Ronceray & Parsloe C (February 2021)
This amended sixth edition (BG 29/2021) takes into account feedback received from users of the sixth edition (BG 29/2020) since it was published in April 2020. Pre-commission cleaning is the process of bringing a closed heating or cooling system to a satisfactory state for commissioning and ongoing maintenance of water quality.
Digital download
£95.00
Hard copy
£115.00
Commissioning Air Systems (Superseded) (BG 49/2015)
by Chris Parsloe (March 2015)
This guide has been superseded by BG 49/2024 Commissioning Air Systems. The guide explains how to commission ducted air distribution systems in building, mainly the setting to work of the system fans and regulation of system flow rates.
Digital download
£35.00
Seasonal Commissioning (BG 44/2013)
by Sands J (January 2013)
There is a growing recognition that not all aspects of the commissioning of a building and its engineering services systems can be carried out during the normal contract period. The concept of seasonal commissioning recognises that some aspects of the systems need to be...
Digital download
£40.00
Hard copy
£40.00
Commissioning Guide Set (Compak3)
by BSRIA (January 2013)
This set of seven BSRIA guides includes guidance on commissioning air systems, commissioning water systems, domestic ventilation airflow rate testing, seasonal commissioning, pre-commission cleaning of pipework systems and commissioning management.
Digital download
£352.00
Pre-Commission Cleaning of Pipework Systems 5th edition (Superseded) (BG 29/2012)
by Brown R & Parsloe C (October 2012)
This Guide has been superseded by BG 29/2020 and BG29/2021
Digital download
£35.00
CIBSE Commissioning Code B: Boilers (CCB)
by CIBSE (June 2012)
Boilers and their associated equipment have evolved dramatically over the last 25 years and Commissioning Code B has been comprehensively revised to take account of these changes.
Hard copy
£64.00
CIBSE Commissioning Code W: Water distribution systems (CCW)
by Parsloe C (Parsloe Consulting) (September 2010)
Commissioning of buildings and building services is vitally important to the safe and energy efficient operation of buildings but it is not always carried out - or carried out systematically. The effective operation of any water system is dependent on satisfactory circuit...
Commissioning Water Systems (BG 2/2010)
by Parsloe C. (September 2010)
This revised guide supersedes AG 2/89.3 Commissioning Water Systems application procedures for buildings, it provides the latest information on water commissioning for practising engineers, and complements CIBSE's updated Code W. Proper commissioning enables engineering systems...
Digital download
£60.00
Model Commissioning Plan (BG 8/2009)
by Deramchi & Hawkins G. (September 2009)
Model commissioning plan (cited in Approved Document Part L2A as 'a way of documenting the process in an appropriate way') provides a commissioning plan template for a construction project. It is intended to help construction project teams and building control officers understand...
Digital download
£60.00
Hard copy
£60.00
Variable-flow water systems - Design, installation and commissioning guidance (AG 16/2002)
by Teekaram A. (November 2002)
The Guidance is of benefit to a wide range of professionals within the building services industry including installing contractors and commissioning specialists, clients, system designers, pump manufacturers and valve manufacturers. It covers Design including Guidelines for...
Digital Download
£60.00
Hard copy
£60.00
Commissioning of pipework systems - design considerations (AG 20/95)
by Parsloe C J. & Spencer A W. (June 1996)
Provides advice regarding the design of heating and chilled water systems, where heating or cooling circuits are serving mainly forced convection heating or cooling coils as might be found in air handling units or fan assisted terminal units. Demonstrates what the priorities are...
Digital download
£80.00
The commissioning of air systems in buildings (Superseded) AG 3/89
by BSRIA (June 1989)
This is a superseded publication. Please refer to the revision history (below) for current guidance
Digital download
£35.00
The commissioning of air systems in buildings (Superseded) AG 3/89.1
by Parsloe C (May 1989)
This is a superseded publication. Please refer to the revision history (below) for current guidance.
Digital download
£35.00
Commissioning HVAC Systems: Guidance on the division of responsibilities (TM 1/88.1)
by Wild J.
Presents an update of TM 1/88. Notes that the use of specialist HVAC commissioning firms is now common in the UK. States that consensus opinion is that the commissioning specialists' performance is sometimes below that purchased under their terms of engagement or subcontract....
Digital download
£15.00
Commissioning water systems: Application principles (Superseded) (AG 2/89.3)
by Chris Parsloe
This Guide has been superseded by BG 2/2010 Commissioning Water Systems.
digital download
£35.00
Commissioning Air Systems (Superseded) (BG 49/2013)
by Chris Parsloe
This is a superseded publication. Please refer to the revision history (below) for current guidance
Digital download
£80.00