This publication has been superseded by the second edition: AG1/2001.
This guide is superseded. The current version is: BG 29/2021 Pre-Commission Cleaning of Pipework Systems
Sets out a comprehensive procedure for pre-commission cleaning. It incorporates BSRIA's previous guidance on system flushing (Application Guide 1/89 'Flushing and Cleaning of Water Systems'), which has been expanded to suit a wider range of situations. Writes for system designers and installers. The Guide is intended to act both as an information source and as a statement of the minimum requirements for achieving effective system cleaning. Section headings are - Design considerations, Installation considerations, System flushing procedure, Chemical cleaning procedure. Appendices supply additional relevant information.
Revision History
1984 original edition: TM 2/84 Flushing and Chemical Cleaning Water Systems
1989 edition: AG 1/89 Flushing and Cleaning of Water Systems
1991 edition: AG 8/91 Pre-Commissioning Cleaning of Water Systems
2001 edition: AG 1/2001 Pre-Commission Cleaning of Pipework Systems
2004 edition: AG 1/2001.1 Pre-Commission Cleaning of Pipework Systems
2011 edition: BG 29/2011 Pre-Commission Cleaning of Pipework Systems
2012 edition: BG 29/2012 Pre-Commission Cleaning of Pipework Systems
2020 edition: BG 29/2020 Pre-Commission Cleaning of Pipework Systems
2021 Current edition: BG 29/2021 Pre-Commission Cleaning of Pipework Systems