New Year, new look for BSRIAJanuary 2025

As we enter a new year, BSRIA is proud to reveal the completion of Phase 1 of our newly retrofitted state-of-the-art offices at BSRIA House in Bracknell.  This milestone demonstrates what is possible with existing building stock, showcasing how retrofitting can drive sustainability and create spaces that reflect both innovation and environmental responsibility.

Now fully decoupled from natural gas for space heating and hot water, the installation of a high efficiency low global warming potential (GWP) HVAC system will enhance indoor environmental quality and reduce energy consumption. Scope 1 and 2 greenhouse gas emissions in 2025 are forecast to be 28% lower when compared with our 2022 baseline.

Our building performance experts meticulously measured the “as-built” performance of the building prior to the commencement of works, enabling informed data-driven decisions to maximise the effectiveness of retrofit measures and financial investment. As part of our ‘Living Laboratory’ project, we’re monitoring in-use performance metrics to evaluate systems and user behaviour, which will further drive continuous whole-building performance optimisation. 

The outputs of the office retrofit and the Living Laboratory will shortly serve as a live case study on the BSRIA website, providing real-world insights for others looking to make similar transitions.

As we continue with subsequent retrofit phases, expect even more exciting updates as we shape a more sustainable, healthier future for our organisation.