This fully revised update to BG 2/2010 includes new guidance on the latest functional testing approaches, reflecting changes to building regulations and the latest CIBSE commissioning codes.
The guide explains how to functionally test and regulate closed heating and cooling systems in buildings. The process mainly comprises the setting to work of the system pumps and the regulation (or proportional balancing) of system flow rates to achieve the design criteria.
The emphasis of this guide is on heating and cooling systems for buildings, although it may also be applied to other types of closed heating and cooling systems, for example heat rejection and heat transfer systems. It is primarily concerned with non-dwelling installations. However, the increasing complexity of systems in large-scale domestic developments, especially those incorporating centralised heating and cooling networks with heat interface units (HIUs), means that the guide may be applicable to dwellings in some circumstances.
Proformas for recording commissioning data are included in the guide, and editable versions can be downloaded via a link provided to users.
The guide is applicable to:
- New-build and retrofit projects.
- Base-build and fit-out.
- All sizes and scale of systems.
- System fine tuning and continuous commissioning.
Note that the guide is not applicable to domestic hot and cold water services.
Revision History
1989 original edition: AG 2/89 The commissioning of water systems in buildings
1992 edition: AG 2/89.1 The commissioning of water systems in buildings
1998 edition: AG 2/89.2 The commissioning of water systems in buildings
2002 edition: AG 2/89.3 Commissioning Water Systems: Application Principles
2010 edition: BG 2/2010 Commissioning Water Systems
Current edition: BG 93/2026 Commissioning Closed Heating and Cooling Systems – a BSRIA guide on Functional Testing and Regulation
Sponsors
BSRIA would like to thank Engineering Commissioning Services (ECS) and Taylor and Stapleton for sponsoring the guide.