Close

Are you visiting bsria.com from outside your region? Visit your regional site for more relevant services and pricing.

Commissioning Guide Set (Compak3)

Contact Information Centre

This set of seven BSRIA guides includes guidance on commissioning air systems, commissioning water systems, domestic ventilation airflow rate testing, seasonal commissioning, pre-commission cleaning of pipework systems and commissioning management.

Overview

BSRIA's commissioning set includes 7 guides: Commissioning Air Systems (BG 49/2015), Commissioning Job Book (BG11/2010), Commissioning Water Systems (BG2/2010), Model Commissioning Plan (BG8/2009), Pre-Commission Cleaning of Pipework Systems (BG29/2020), Domestic Ventilation Systems - guidance for measuring airflow rates (BG46/2015) and Seasonal Commissioning (BG44/2013).

  • Commissioning Air Systems is newly updated and covers essential design requirements, installation considerations and commissioning procedures plus information on reporting and documentation.
  • Commissioning Job Book is written for everyone in construction to see how commissioning fits into their project activity from the preparation stage, through design and construction to handover and after care.
  • Commissioning Water Systems provides the latest information on water commissioning for practising engineers, and complements CIBSE's updated Code W.
  • Model Commissioning Plan is intended to help construction project teams and building control officers understand and record the commissioning activities that need to be carried out – now contains editable word templates.
  • Domestic Ventilation Systems - guidance for measuring airflow rates provides advice on types of ventilation systems, performance requirements, design and installation, airflow measurement – conditional, unconditional and minimum benchmark methods, testing and commissioning.
  • Seasonal Commissioning defines what seasonal commissioning is, the reasons for carrying it out and which tasks and activities fall under the scope of seasonal commissioning.

* NB: The current edition of Pre-Commission Cleaning of Pipework Systems, BG29/2020, is only available in PDF.  If you order the COMPAK3 set in hardcopy, please email bookshop@bsria.co.uk to add your name to our list to be sent a copy of BG29/2020 when it is published in hardcopy  later this year. In the meantime, you will be sent a complimentary PDF copy. 

These guides are available to purchase in this set or individually in PDF or hard copy formats.

Product details

  • Published: January 2013
  • Publisher: BSRIA
  • Author: BSRIA