Close

Are you visiting bsria.com from outside your region? Visit your regional site for more relevant services and pricing.

Commissioning Air Set of 2 guides (CCA/BG49)

Contact Information Centre

Set contains CIBSE Code A and BG49/2015 Commissioning Air Systems. BG49/2015 explains how to carry out procedures in order to comply with the standards outlined in CIBSE Commissioning Code A.

Overview

Set contains CIBSE Commissioning Code A (which sets out the normal standards of good practice accepted by the building services industry) and BG49/2013 Commissioning Air Systems which explains how to carry out procedures in order to comply with the standards outlined in CIBSE Commissioning Code A.

BG 49/2015 explains how to commission ducted air distribution systems in buildings. The commissioning process mainly comprises the setting to work of the system fans and the regulation of system flow rates. This guide comes with a copy of our Domestic Ventilation Systems – a guide to measuring airflow rates (BG 46/2015), in order to provide additional information on low pressure domestic systems.

CIBSE Commissioning Code A deals with the stages that must be gone through in order to commission a typical air distribution system. The Code includes sections on the preliminary checks that need to be made, the regulation of air flow, relevant documentation and witnessing. This Code was first published in August 1996, but was reviewed and confirmed in 2006.

Product details

  • Publisher: BSRIA / CIBSE
  • Published: August 2014