This edition supersedes BSRIA TN 21/97, TN 22/97 and BG 6/2006.
The publication provides a framework for allocating many of the design activities needed to complete a construction project, to the different members of a project team. Summarises some of the perceived shortcomings in past and current practice.
The appendices break design activity into key stages and are presented as pro-formas for allocating design among the members of the project team. These are supported by pro-formas for allocating drawing production.
This second edition is now based upon the 2008 RIBA Plan of Work and the 2007 CIC Consultants' Contract.
Contents
1 INTRODUCTION
2 USING THE TECHNICAL GUIDE
2.1 Introduction to the appendices
2.2 Past and current practice
2.3 Checklist of design activities (Appendix A) 2.4 Checklist of drawing deliverables (Appendix B) 2.5 Drawing definitions (Appendix C)
2.6 Completing the pro-formas
2.7 Using the pro-formas
2.8 Non-building services specialist design
2.9 Effect of procurement route
2.10 Commissioning specification
2.11 Precision in design
2.12 Design reviews
2.13 CIC scope of services
APPENDIX A:PRO-FORMA FOR ALLOCATING DESIGN ACTIVITY
APPENDIX B:PRO-FORMA FOR ALLOCATING DRAWING PRODUCTION
APPENDIX C: DRAWING DEFINITIONS
APPENDIX D: CROSS-REFERENCE OF TERMINIOLOGY
APPENDIX E: CROSS-REFERENCE TO CIC SCOPE OF SERVICES
Revision history