Due to potential conflicts arising from working on building projects, there was a need to provide a framework to help stakeholders identify roles and responsibilities within a given project in order to work more effectively and within specified timelines. The product of a working syndicate at a Futures Workshop hosted by BSRIA in April 1991, this Technical Note encapsulates the collaborative findings and proposed solutions of the fifty attendees. This guide has been produced with three specific objectives in mind:
- to explain the root causes of conflict associated with design responsibilities as clearly and accurately as possible
- to propose methods by which the conflict situations identified might be avoided
- to provide a set of pro forma lists of design activities as an aid to implementing the proposed recommendations.
Contents:
Introduction
Research Approach
The nature of the problem
The legal interpretation
Common industry practice
Installation drawings
Contract Document clauses
Legal obligation
The basis for a solution
Causes of conflict - specific problems and their solutions
Definitions for different types of design drawing
The problem
Proposed solution
The selection of plant equipment
The problem
The proposed solution
The selection and appointment of companies providing specialist design input
The problem
The proposed solution
Commissioning activities
The problem
The proposed solution
Production of handover information
The problem
The proposed solution
How to avoid conflict - practical guidance