Pre-Commission Cleaning of Pipework Systems 3rd edition (Superseded) (AG 1/2001.1)

Contact Information Centre

This publication has been superseded by BG 29/2011.

Download a sample preview

Overview

A revised edition of Application Guide AG 1/2001 which contains all the recommendations for design, installation, system flushing and chemical cleaning of pipework systems; but also includes a complete new section dealing with the issues raised when connecting new pipework to existing pipework. The Guide is intended for designers and installers of recirculating heating and cooling systems and does not apply to hot and cold water supplies. Includes tests for pseudomonas.

Revision History

First edition: AG 8/91 Pre-Commissioning Cleaning of Water Systems

Second edition: AG 1/2001 Pre-Commission Cleaning of Pipework Systems

Third edition: AG 1/2001.1 Pre-Commission Cleaning of Pipework Systems (published in 2004)

Fourth edition: BG 29/2011 Pre-Commission Cleaning of Pipework Systems

Fifth edition: BG 29/2012 Pre-Commission Cleaning of Pipework Systems

Sixth edition: BG 29/2020 Pre-Commission Cleaning of Pipework Systems

Amended sixth edition: BG 29/2021 Pre-Commission Cleaning of Pipework Systems

Product details

  • Published: September 2004
  • Publisher: BSRIA
  • Author: Parsloe C J
  • ISBN-13: 0-86022-644-1

Common customer questions & answers

QQuestion Which edition of BSRIA’s Pre-commission Cleaning guide should I be using?
AAnswer The current edition of BSRIA’s Pre-commission Cleaning guide is BG 29/2021. It was revised in partnership with the CSCA with input from an industry steering group, members of which are listed in the guide. It supersedes all previous editions of the guide. It is BSRIA’s intention that, in normal circumstances, BG 29/2021 should be used in preference to any superseded editions of the guide. Superseded versions of the guide are still available (see Revision History above) as they provide useful reference information for older projects. Users of BG 29/2021 should be aware that it is a guide, not a regulation. It is for individual project teams to decide whether to follow the guidance, and this should be made clear in project documentation.